Consulting – PERFORMANCE TEST (AT SHOP vs AT SITE)

PERFORMACE TEST (AT SHOP vs AT SITE) IN RECIPROCATING COMPRESSORS

ADVANTAGES IN PERFORMANCE TEST (AT SHOP)

There are several advantages to applying a performance test at SHOP for RECIPROCATING COMPRESSORS, such as ISO CODES or equivalent, including:

  1. Improved reliability: Performance testing helps identify any issues with the compressor’s performance, allowing for early identification and rectification of potential issues before they lead to equipment failure.

  2. Increased safety: Ensuring that the compressor is performing optimally reduces the risk of equipment failure, which can lead to accidents, injuries, or even fatalities.

  3. Better efficiency: Performance testing helps identify areas of inefficiency in the compressor’s operation, allowing for optimization of the equipment, leading to better energy efficiency and cost savings.

  4. Compliance with standards: Many industry standards require regular performance testing of equipment, and compliance with these standards can be achieved through performance testing.

  5. Verification of equipment specifications: Performance testing can verify that the compressor is meeting the specifications set out in the purchase order and contract, ensuring that the equipment performs as expected.

Overall, performance testing of reciprocating compressors at SHOP can help to improve equipment reliability, safety, efficiency, compliance, and specification verification.

ADVANTAGES IN PERFORMANCE TEST (AT SITE)

Performing a performance test on reciprocating compressors at site using ISO codes or equivalent can have several advantages in terms of improving reliability, safety, and avoiding critical risks and failures, including:

  1. Ensuring optimal performance: A performance test can provide accurate data on the compressor’s efficiency, capacity, and power consumption, allowing operators to make adjustments to optimize performance.

  2. Early detection of potential problems: Performance tests can detect any issues in the compressor, such as misalignment, excessive vibration, or worn components, before they cause a catastrophic failure.

  3. Compliance with regulations and standards: Performance tests using ISO codes or equivalent can help ensure that the compressor meets regulatory requirements and industry standards, such as ISO 9001 or API 618.

  4. Improved safety: Accurate performance data can help prevent accidents caused by improper operation or maintenance of the compressor.

  5. Cost savings: By identifying inefficiencies or potential problems, a performance test can help operators avoid costly repairs or replacements, and improve overall efficiency and longevity of the compressor.

Overall, conducting performance tests on reciprocating compressors using ISO codes or equivalent at site can improve operational reliability, reduce risks, and optimize the performance of the compressor, which can result in cost savings and improved safety.

DISADVANTAGES IN PERFORMANCE TEST (AT SHOP)

Some potential disadvantages of applying a performance test at the shop for reciprocating compressors using ISO codes or equivalent may include:

  1. Cost: Performance testing can be an expensive process that requires specialized equipment and expertise. Performing the test at the shop may require additional expenses for transportation and setup of the equipment.

  2. Downtime: Testing may require the compressor to be shut down for an extended period of time, which can disrupt the production process and result in lost revenue.

  3. Limited operating conditions: Testing at the shop may not allow for testing under a full range of operating conditions that the compressor would experience in its actual installation, which could result in incomplete or inaccurate data.

  4. Inaccurate representation: Testing at the shop may not accurately represent the actual installation environment of the compressor, which could result in inaccurate data and incorrect conclusions about the performance of the compressor.

  5. Logistics: Shop testing may require coordination between the manufacturer and the end user, as well as potentially require third-party involvement in order to handle the logistics of transportation and installation of the equipment.

DISADVANTAGES IN PERFORMANCE TEST (AT SITE)

Some potential disadvantages of performing a performance test on-site for reciprocating compressors using ISO codes or equivalent include:

  1. Disruption to production: Performance testing requires taking the compressor offline for a period of time, which can cause a disruption in production and potentially lead to a loss of revenue.

  2. Cost: Conducting on-site performance testing can be expensive due to the need for specialized equipment and personnel. This may make it difficult for some companies to justify the cost of the test.

  3. Safety concerns: The performance test may involve operating the compressor under extreme conditions, which could pose safety risks to workers and the surrounding area.

  4. Limited testing conditions: On-site testing may not be able to replicate all of the conditions that the compressor may experience during operation, such as extreme temperatures or pressures, which could impact the accuracy of the test results.

  5. Time constraints: Performing on-site testing may take longer than testing in a shop, which could delay the commissioning of the compressor and result in additional costs.

WHY, WHEN, WHERE, WHAT, WHICH, HOW TO APPLY THE PERFORMANCE THEST (SHOP vs SITE)

To improve the reliability and safety of reciprocating compressors in existing plants and new projects within the oil, gas, and petrochemical industries, it is important to consider the application of performance tests both at the shop and at the site. Here’s an explanation of why, when, where, what, which, and how to apply these performance tests:

Why Apply Performance Tests:

  1. Reliability Assurance: Performance tests help ensure that reciprocating compressors meet the required performance specifications and operate reliably under expected conditions.
  2. Safety Verification: Performance tests verify that the compressors are operating within safe operating limits and that all safety features and controls are functioning correctly.
  3. Quality Control: Performance tests provide a means to assess the quality and integrity of the compressors before installation or commissioning.
  4. Optimization: Performance tests allow for the identification of potential performance improvements and optimization opportunities.

When to Apply Performance Tests:

  1. Shop Testing: Performance tests at the shop are typically conducted before the delivery of the compressor to the site, ensuring that it meets the specified performance requirements.
  2. Site Testing: Performance tests at the site are typically conducted during commissioning or after installation to verify the performance and safety of the compressor under actual operating conditions.

Where to Apply Performance Tests:

  1. Shop Testing: Performance tests are conducted at the manufacturer’s shop or a designated facility where the compressor is manufactured or assembled.
  2. Site Testing: Performance tests are conducted at the site where the reciprocating compressor is installed and will operate.

What Performance Tests to Conduct:

  1. Factory Acceptance Test (FAT): This test is conducted at the shop to verify that the compressor meets the specified design and performance criteria before it is delivered to the site.
  2. Site Acceptance Test (SAT): This test is conducted at the site to validate the performance, reliability, and safety of the compressor under actual operating conditions.

Which Parameters to Measure:

  1. Flow Rate: Measure and verify the compressor’s flow rate to ensure it meets the required specifications.
  2. Pressure: Measure and verify the compressor’s discharge pressure to ensure it operates within the specified range.
  3. Efficiency: Assess the compressor’s efficiency to ensure it is performing optimally.
  4. Vibration and Noise: Monitor and analyze vibration and noise levels to identify potential issues related to reliability and safety.

How to Apply Performance Tests:

  1. Planning: Develop a comprehensive test plan that outlines the objectives, procedures, and acceptance criteria for both shop and site testing.
  2. Equipment Setup: Ensure proper installation and setup of instruments and measurement devices to accurately capture performance parameters.
  3. Data Collection: Collect and record performance data during the tests using appropriate instrumentation and measurement techniques.
  4. Data Analysis: Analyze the collected data to evaluate the compressor’s performance, compare it against the specified requirements, and identify any deviations or issues.
  5. Corrective Actions: If any deviations or issues are identified, take appropriate corrective actions to address them before finalizing the commissioning or installation process.
  6. Documentation: Document the test results, including any deviations or issues encountered, and maintain a comprehensive record for future reference and comparison.

PROCEDURES, ACTIONS, STUDIES, MITIGATION, RECOMMENDATIONS TO APPLY PERFORMANCE TEST AT SHOP vs AT SITE

  1. PROCEDURES: a. Pre-Test Planning: Properly plan the performance test by defining objectives, test conditions, and acceptance criteria. This includes determining the test duration, instrumentation requirements, and performance parameters to be measured.

    b. Equipment Preparation: Ensure the reciprocating compressor is correctly installed, aligned, and properly prepared for the test. Check the condition of components such as valves, pistons, and seals.

    c. Instrumentation: Install appropriate instruments to monitor key parameters such as discharge pressure, suction pressure, temperatures, vibrations, and lubrication system performance.

    d. Test Execution: Follow a standardized procedure for conducting the performance test, including starting and stopping procedures, recording data at regular intervals, and observing safety protocols.

    e. Data Analysis: Collect and analyze the test data to evaluate the compressor’s performance against specified parameters. Compare the results with the manufacturer’s performance curves or industry standards.

  2. ACTIONS: a. Regular Maintenance: Perform routine maintenance tasks, such as lubrication, cleaning, and inspection of critical components, to ensure the compressor operates optimally.

    b. Performance Monitoring: Implement a continuous performance monitoring program to identify any deviations from expected performance. Use condition monitoring techniques like vibration analysis and thermography to detect abnormalities.

    c. Training and Competence: Train personnel involved in compressor operation and maintenance to enhance their skills and knowledge. This includes understanding the specific requirements of reciprocating compressors and troubleshooting common issues.

  3. STUDIES: a. Failure Modes and Effects Analysis (FMEA): Conduct an FMEA to identify potential failure modes, their causes, and associated risks. This analysis helps prioritize critical components and establish preventive measures.

    b. Root Cause Analysis (RCA): Perform RCAs to investigate any performance deviations, failures, or incidents encountered during the performance test. Determine the underlying causes and develop corrective actions to prevent their recurrence.

  4. MITIGATION: a. Safety Measures: Implement safety protocols and precautions during performance tests, such as proper ventilation, use of personal protective equipment (PPE), and adherence to lockout/tagout procedures.

    b. Quality Control: Establish quality control procedures for manufacturing, installation, and maintenance of the compressor to ensure it meets design specifications and industry standards.

    c. Risk Assessment: Conduct a comprehensive risk assessment to identify potential hazards associated with the compressor’s operation and develop mitigation strategies accordingly.

  5. RECOMMENDATIONS: a. Periodic Testing: Conduct regular performance tests at both the shop and the site to evaluate the compressor’s performance under different conditions and identify any discrepancies.

    b. Documentation: Maintain comprehensive documentation of all performance tests, including test procedures, results, and any actions taken. This documentation serves as a valuable reference for future troubleshooting and comparisons.

    c. Continuous Improvement: Foster a culture of continuous improvement by actively seeking feedback, analyzing performance trends, and implementing appropriate modifications or upgrades to enhance reliability and safety.

Implementing these procedures, actions, studies, mitigations, and recommendations can help improve the reliability and safety of reciprocating compressors during performance tests conducted at both the shop and the site.

FREQUENT QUESTIONS & ANSWERS FOR PERFORMANCE TEST APPLICATIONS

Here are some common questions and answers about applying performance tests to reciprocating compressors using ISO codes or equivalent:

Q: What is a performance test for reciprocating compressors? A: A performance test for reciprocating compressors is a comprehensive evaluation of the compressor’s performance using standardized test procedures, such as the ISO codes. The test is conducted to assess the compressor’s efficiency, capacity, and power consumption under various operating conditions.

Q: Why is a performance test necessary for reciprocating compressors? A: A performance test is necessary to ensure that the compressor is operating at its optimum level and to identify any issues that may affect its reliability, safety, and efficiency. It can also help identify opportunities for energy savings and maintenance improvements.

Q: When should a performance test be conducted on a reciprocating compressor? A: A performance test should be conducted during the commissioning of a new compressor, after any major maintenance or repair work, and periodically to ensure that the compressor is operating at its optimal level.

Q: What are the benefits of conducting a performance test on a reciprocating compressor? A: Conducting a performance test on a reciprocating compressor can help improve its reliability, safety, and efficiency. It can also help identify any issues that may affect its operation and prevent costly downtime or equipment failure.

Q: What are the ISO codes and why are they important? A: The ISO codes are a set of internationally recognized test procedures for determining the performance of reciprocating compressors. They provide a standardized method for testing compressor efficiency, capacity, and power consumption, which enables accurate comparisons between different compressor models and manufacturers.

Q: Who can conduct a performance test on a reciprocating compressor? A: Performance tests should be conducted by qualified and experienced personnel who are trained in the ISO codes and other relevant industry standards. This may include manufacturer representatives, third-party testing companies, or in-house testing teams.

Q: What factors can affect the results of a performance test on a reciprocating compressor? A: The accuracy of the test results can be affected by a variety of factors, such as variations in operating conditions, measurement equipment, and testing procedures. To ensure accurate and reliable results, it is important to follow standardized testing procedures, use calibrated equipment, and perform tests under controlled conditions.